Electrolysis Cabinet Remote Monitoring System —— Realize remote intelligent protection
The Electrolytic Power Equipment is the core equipment in the electrolysis process. It is specially designed for applications such as electrolysis of aluminum,...
Power Distribution Electrical Box Electrolysis Cabinet
The high-frequency switching power supply generates low-voltage and high-current output by inputting high-voltage AC rectification, high-voltage filtering, high-voltage high-frequency...
High Voltage Power Electrical Cabinet Equipment —— operation status in real time Core functional advantages of Electrolytic Power Equipment
High-efficiency rectification technology & Electrolytic Cabinet Automation Control
High-precision...
Low-Voltage Power Electrolysis Cabinet Electrical Equipment
Advantages of Electrolytic Power Equipment:
Low-voltage and high-frequency rectification technology also has the characteristics of fast response. When the load changes during the...
Low and High Voltage Power Electrolysis Cabinet
Advantages of high-frequency switching power supply for Electrolytic Power Equipment High reliability of Low Voltage Control Cabinet Electrical: The new generation of switching power supply products...
PLC Electrolysis Cabinet Complete Control
Benefits of high-frequency switching power supply for Electrolytic Power Equipment control system compared with traditional rectifier power supply Fast response
Since the operating frequency of the switching...
Provide stable and efficient DC power supply for the electrolysis process and achieve precise current and voltage control.
2.
What is the main benefit of your product ?
Green energy saving, high efficiency, high power factor, efficiency can reach more than 94%, saving 10%~30% of electricity compared with traditional rectifier power supply.
3.
Are you a manufacturer?
Yes. We are a manufacturer. We have focused on research, development, production, sales, and after-sales of harmonic devices for 20 years. Our production base is in Zhaoqing.
4.
How long is your delivery time?
Our delivery time is generally 90 days.
5.
Is technical support available for installation and operation?
Yes, we provide comprehensive technical support, including installation guidance, operator training, and ongoing maintenance services.
6.
How can I get in touch for more information?
Feel free to reach out to us via:Email: yuanjingcorinne@gmail.comPhone: 17727372803Address: Room 1101, Building T8, No. 28, Jihua 1st Road, Chancheng District, Foshan City, Guangdong Province